Menu Content/Inhalt

Industries

  
From aerospace to wastewater Prodigy SCADA HMI software ensures the smooth running of industry 24/7

Free Application Advice

Unsure if Prodigy is suitable for your project?
 
We will be pleased to advise you without any obligation.
 

Search the site

Wastewater Treatment Plant Monitoring

Print E-mail
Wastewater treatment monitoring system for replacement of obsolete manual controls and chart recorders using Prodigy SCADA software


Watstewater treatment
Example screen shot
Plant disturbances on a wastewater treatment plant which discharges to a river can have disastrous consequences and, therefore, it is imperative that the monitoring system warn of significant changes as early as possible. In addition, the wastewater treatment plant runs unmanned for long periods of time and in the event of an alarm condition, unfamiliar staff need to be quickly directed to take corrective actions.

The project involved the replacement of obsolete manual controls and chart recorders with a single PC based system.

Using Prodigy’s online maintenance facility, alarm conditions linked to the appearance of maintenance icons provide the user with access to the knowledge store. This included: Word documents detailing normal preventative actions, standard procedures and parts lists; PDF files of Plant schematics and wiring diagrams; and annotated digital photographs of the relevant valves, pumps etc.

Key Benefits

Wastewater Treatment Plant Monitoring
  • Replacement of ageing chart recorders and out of date plant mimic panels
  • Direct link to existing PLCs
  • Ability to modify the plant mimic as the process is altered
  • Provision of online maintenance to build a knowledge store from their expert staff
  • Increased plant efficiency allows improved output without capital expenditure

Automatic measurements, such as the amount of wastewater discharged and recycled, were combined with manual entries of, for example, the quantity of solids removed to provide weekly reports to all key staff.

An important benefit provided by the system was the ease of analysis of plant data, which is continuously recorded. In particular the on screen trending was a major improvement over the older recorder charts. Using the new system it was possible to increase the treatment plant throughput considerably. This allowed the company to bring extra manufacturing capacity online, which would not have been possible before without expensive upgrade of the wastewater treatment plant.

If you have a wastewater treatment plant application and would like more information please This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

This application summary is also in pdf format - left click on the attached file link below to view or right click to save the document to your computer.

Attached files

Wastewater Treatment Plant Monitoring.pdf
Application write up - pdf format